About Leslie Turner

This author has not yet filled in any details.
So far Leslie Turner has created 52 blog entries.

Eye Clinic Study for the Pierre-Le Gardeur Hospital

The CISSS de Lanaudière plans to proceed with renovations to the Pierre-Le Gardeur Hospital in order to host an eye clinic. Spaces currently designed for offices will be redeveloped to accommodate a reception station, a waiting room, examination rooms for various uses, a mini operating room for cataracts and other related spaces.

Eye Clinic Study for the Pierre-Le Gardeur Hospital2019-03-08T11:31:28-04:00

Not for the Faint of Heart!

Designed by architect Roland Dumais and inaugurated in 1970, this brutalist-style building is requiring major renovation of its concrete facades. BARIN is overseeing the judicious repair and restoration of this heritage building, the second campus for the HEC (École des Hautes études commerciales) de Montréal. This world-renowned French-language university offers management education and research and has been training future managers who contribute to our society’s growth and prosperity, since 1907.

Not for the Faint of Heart!2019-03-08T14:59:12-04:00

Metro Blue Line Extension

Barin / Jodoin Lamarre Pratte architectes en consortium have won the bid for work on the extension of the Metro’s Blue Line. The project includes the addition of 5 new metro stations and Phase I’s mandate includes the technical specifications and the inputs required for tender.

Metro Blue Line Extension2019-02-08T15:02:26-04:00

CIUSSS Centre-Sud Accessibility Study

Following the introduction and enforcement of Law 10, all CISSS and CIUSSS, as a result of their status as public bodies, have the new obligation to produce an action plan for persons with disabilities. The mandate of this project is to provide a reliable picture of the physical condition of the buildings that make up their real estate holdings in terms of accessibility for people with disabilities along the barrier-free path.

CIUSSS Centre-Sud Accessibility Study2019-02-11T09:24:36-04:00

Saint-Noël-Chabanel School’s Phase I

(Équipe BARIN SMITH VIGEANT architectes) École Saint-Noël-Chabanel, in the Saint-Michel Nord district, is one of the largest primary schools of the CSDM. It consists of two pavilions separated by 25th Avenue. The last addition was built in 2015 and the original in 1958. This first phase includes the refurbishment of the rear facade, including masonry replacement, insulation and waterproofing work, replacement of doors, frames and curtain walls, replacement of the gymnasium roof, and the redesign and upgrade of all its interior finishes. Phase II, which will consist of a complete interior renovation of the school of origin, will follow in 2020.

Saint-Noël-Chabanel School’s Phase I2019-02-05T18:41:36-04:00

The STM is on the Move!

BARIN is involved in the relocation of certain parts painting equipment for the STM workshops. This relocation will support the construction of the new STM complex. The services thus relocated will free the old buildings destined to be demolished in order to make room for the new complex. The relocation of these services also makes it possible to modernize and consolidate existing facilities.

The STM is on the Move!2019-01-10T15:50:09-04:00

Residence Ste-Rose is Progressing!

The expansion of this intermediate care senior’s residence is well underway with completion geared for spring 2019! The existing complex consists of two adjoining buildings, the smaller and older of which, demolished and replaced with a new and improved 6-storey building. It offers 105 units for autonomous as well as semi-autonomous living, a dementia wing, resident services on the ground floor level, as well as underground parking.

Residence Ste-Rose is Progressing!2018-12-21T13:48:43-04:00

10 Years is Something to Celebrate!

We all raised a glass to celebrate Julie Carrier’s, Alejandro Ortega’s and Éric Tessier’s 10-year milestone recently. Barin’s team expressed their personal appreciation for each of them in the form of a dedication display, with personalized notes and tributes and last but not least an inscribed trophy! Each one has made an immeasurable contribution to the success of the firm! Here’s to another 20 years at least!

10 Years is Something to Celebrate!2018-12-17T16:06:53-04:00

Elevator Additions at Angrignon Station

The STM has launched the tender for the addition of two elevators at the Angrignon metro station. The plans and specifications for this project were prepared at the Metro Fixed Equipment Project Office by BARIN. This expansion project aims to make the station accessible to people with reduced mobility.

Elevator Additions at Angrignon Station2018-12-17T16:09:36-04:00